Euler maintenance (3-6 March 2026)¶
CSCS informed us that the data center will be undergoing a site-wide cooling maintenance on Wednesday 4 March 2026, which will require a complete shutdown of Euler.
The date of this maintenance is fixed by CSCS and is beyond our control. Consequently, this maintenance cannot be cancelled or postponed.
Tentative schedule¶
| Date/time | Action |
|---|---|
| Tue 3 Mar, 3pm | Start of power-down procedure, Euler off-line |
| Wed 4 Mar, full day | CSCS maintenance, Euler completely down |
| Thu 5 Mar, afternoon | Login nodes up, access to storage possible |
| Fri 6 Mar, afternoon | Gradual reactivation of batch queues: first 4h, then 24h, and finally 120h |
As usual, batch queues will be progressively inactivated in the days and hours prior to the maintenance, to ensure that no jobs get killed when the cluster is shut down. Jobs with a runtime request shorter than the time left to the start of the maintenance window can still run until the cluster is taken off-line. You will not be able to access your data between Tuesday afternoon and Thursday afternoon. If all goes well, Euler will start running jobs again in the afternoon of Friday, 6 March and will be fully operational in the evening.
This is for your information only. No action is required on your part.
4 March 2026 16:30
The cooling maintenance in the CSCS datacenter is complete and the Euler login nodes are available again.
On Thursday, 5 March, the compute nodes will be brought online and tested. Afterwards the Slurm partitions will be gradually opened.
5 March 2026 10:05
We are currently ahead of schedule. The 4h and 24h queues are now open, and if no issues arise, the 120h queues will be opened around noon.
5 March 2026 11:30
All queues are open, the cluster has returned to full operation, and the maintenance window has concluded.